CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
Aligned is about to build a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International. The company’s plan for the 36-acre site calls for a pair of two-story, 520,000-square-foot data centers.
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
Formerly known as "ColoCrossing CH1"
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
T5 Data Center is expanding its footprint in Chicago. T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 300,000 sq ft facility for multi-tenant or single-tenant operations.
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
800a 480V 3 phase450kW diesel generator with 24 hour run time at full load500kVa UPS capacity with battery backup
9 MW of critical capacityBoth a 1.5MW and a 2MW transformer
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
Former GTT suite
T5 Data Centers is developing a new data center campus in Grayslake, Illinois, about 40 miles northwest of Chicago.
4 MW Critical Load on Each Floor (Floors 1-5)130-160 Watts per Raised Floor SF
The campus was a former Sun Times Press Facility and was acquired in 2014
The site is a former Switch and Data site (also owned by Equinix for a short period.)
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
The 10 story building was constructed in 1923 and eventually was converted into a data center.
1547 Acquired the site in December of 2018.